KeyWord: Brand:

Shandong Shengwei new energy Co., Ltd.    No Member

Shandong Shengwei new energy Co., Ltd. Brand
Business Model
Founded
Introduction
Large domestic heat-conducting oil furnace professional manufacturing enterprise, specializing in the manufacture of heat-conducting oil furnace, heat conducting oil, organic heat carrier furnace, heating furnace. Hold the heat conduction oil boiler issued by the State General Administration of quality supervision, inspection and Quarantine of manufacturing license. Our company introduced France heat-conducting oil furnace technology, built with "ISO9001" mode of international standard for quality management system, has formed the coal, fuel, gas, fuel waste, burning sand powder, waste heat utilization etc. series products, more than 300 kinds of specifications models. Principle of heat-conducting oil furnace: coal, heavy oil, light oil to other combustible materials, flammable gas as fuel, heat conduction oil as heat carrier. The use of circulating pump forces the liquid circulation, the heat transfer to the thermal equipment, DC special industrial furnace and then return to the heating. Widely used such as petrochemical, textile, printing and dyeing, plastics, rubber, food processing, wood processing, asphalt heating, carton production, dehydrated vegetables, baking, casting sand mold drying etc.. Heat conducting oil furnace (organic heat carrier furnace) characteristics: 1 under low working pressure, obtain higher working temperature. Heat 2 can into the stable and accurate temperature. 3 in a wide range of load, heat efficiency can be maintained at an optimum level. The 4 liquid phase transport of heat, at 300 degrees centigrade heat conducting oil is water saturated steam pressure 70 times. 5 has the operation control and safety monitoring device is complete, our company has the exclusive program process control technology, can make the heat conduction oil furnace outlet temperature control in the plus or minus 1 deg. 6 electricity, oil and water, save the cost, 3~6 months of alternative investment recovery steam boiler.
Main Products
Contact information
Contact:  
Tel:  
Addr:   [db: province]  The city of [db:]  Shandong Linyi Luozhuang high tech Development Zone